Dilapidations White Paper

J000142---GBD---White-Paper---Front-Cover

THE M&E ENGINEER’S ROLE IN DILAPIDATIONS LIABILITIES CAN NO LONGER BE IGNORED

Since the introduction of the Dilapidations Protocol in 2012, there has been an increase in the accuracy of cost assessments to support out of court resolutions. Whilst building surveyors are managing this process more efficiently, they are not normally qualified or experienced in assessing the condition of complex mechanical and electrical equipment. Download the guide to read examples of inaccurate assessments and the suggested process for engineering inspections.



Download White Paper



Back to Homepage